Installation sequence of chicken manure dryer for organic fertilizer equipment

The installation of the chicken manure dryer for organic fertilizer equipment should be constructed in strict accordance with the requirements of the above assembly drawings and basic drawings. Before the installation of the chicken manure dryer for organic fertilizer equipment, its parts and auxiliary parts should be checked, cleaned and cleaned. Clean and complete. Since the organic fertilizer equipment chicken manure dryer is a long and large-scale equipment, the installation should be carried out in this order and method:
1. Draw the base line: Make crosshairs, elevation lines, and embed the center mark correctly on the base target to be easy to use and accurate, and consider that the machine base will not be covered after installation.
2. Install the base and the tug: level the position of the pad iron, draw the center line of the base and the tug, find the installation position of the base and the tug according to the requirements of the drawings, level and straighten it, first grouting the foundation hole, and the concrete reaches a certain strength Tighten the anchor bolts, and then install the sand dryer cylinder after passing the review.
3. Install the cylinder body and the rolling ring: first install the rolling ring on the cylinder body, and the concave joints required for fixing should be staggered in one positive and one reverse configuration, and adjust the thickness of the pad iron to keep the contact between the rolling ring and the concave joint. The corresponding gap should not be consistent, and spot welding the head of the concave joint bolt and the cylinder.
4. Install the large gear: Before installation, check that the interface of the butting surface has no collision marks, clean the contact surface between the large gear and the cylinder, then carefully align the two halves of the gear and tighten the interface bolts, then install the large gear on the cylinder. body. Rotate the cylinder to check the radial runout and lateral swing of the large gear until the adjustment is qualified.
5. Install pinion, reducer and motor: According to the installed large gear, adjust the meshing parameters of the large and small gears to meet the requirements of the equipment, and fix the position of the pinion and the reducer motor.
6. Install the gear cover: make it evenly spaced from the edge of the gear.
After all the above work is done, carry out secondary grouting. The requirements for grouting should be carried out in accordance with the relevant regulations of civil engineering design. The installation review and debugging work related to grouting are carried out simultaneously to ensure the installation quality of the organic fertilizer equipment chicken manure dryer.