Installation sequence and method of organic chicken manure dryer

The installation of the organic fertilizer equipment chicken manure dryer should be strictly in accordance with the requirements of the assembly drawing and the basic drawing. Before the organic fertilizer equipment chicken manure dryer is installed, its parts and auxiliary parts should be checked, wiped and cleaned. Complete and complete. Since the organic fertilizer equipment chicken manure dryer is a long-body large-scale equipment, the installation should be carried out in this order and method:

1.Draw the base line: Make the cross line, the elevation line, and the center mark on the base target plate to achieve convenient and accurate embedding, and consider that the base will not be covered after installation.

2.Install the base and the tug: flatten the position of the shim, draw the center line of the base and the tug, according to the drawing requirements, find the installation position of the base and the tug, level and lay it, first grouting the foundation hole, the concrete reaches a certain strength Tighten the anchor bolts, and then install the sand dryer cylinder after the review is qualified.

3.Install the barrel and rolling ring: first install the rolling ring on the barrel, and the concave joints required for fixing should be arranged in a positive and negative staggered configuration, and the thickness of the shim should be adjusted to keep the contact between the rolling ring and the concave joint The corresponding gap should not be the same, and the head of the concave joint bolt and the cylinder should be spot welded.

4.Install the big gear: Before installation, check that there should be no collision marks on the interface of the mating surface, clean the contact surface of the big gear and the cylinder, and then carefully align the two gear halves and tighten the interface bolts, and then install the big gear on the cylinder. Physically. Rotate the cylinder, check the radial runout and lateral swing of the big gear until the calibration is qualified.

5.Install the pinion gear, reducer, and motor: According to the large gear that has been installed, adjust the meshing parameters of the large and small gears and meet the requirements of the equipment. Fix the position of the pinion and reducer motor.

6.Install the gear cover: make it symmetrical with the edge of the gear.

After all the above work is done, the second grouting is carried out, and the requirements for grouting shall be carried out in accordance with the relevant regulations designed by Shijian. The installation review and debugging work related to grouting are carried out simultaneously to ensure the installation quality of the organic fertilizer equipment and chicken manure dryer.