How is the organic fertilizer grinder installed?

Let’s learn how to install the organic fertilizer grinder.
1. All equipment should be firmly connected, and the joints of pipelines should be strictly prevented from leaking gas. If leakage occurs at the joints of pipelines, it will not only produce dust pollution, but also reduce production capacity and product quality.
2. The electrical control cabinet should be installed in a position that is easy to operate and easy to observe the operation of the equipment. The electrical connection lines and control lines between the various equipment should be arranged and placed in the wiring ducts according to the relevant national regulations.
3. The electrical control cabinet should be equipped with the open and stop buttons, working indicator lights, pulverizer ammeters, speed control knobs of the feeding motor and grading motor, and various protection devices.
4. All crusher equipment must be installed in accordance with relevant regulations.